TDOT Lane Closure Report for Middle Tennessee March 13 – 18, 2020

traffic

CHEATHAM COUNTY, Slope Stabilization on US 70 near LM 6.2
From now through May 2020, There will be a lane closure on US 70 between LM 6 and 7 (between Shady Grove Lane and Tanglewood Drive) for slope stabilization work. Temporary traffic signals will be used during construction.

CHEATHAM COUNTY, Bridge Repair on SR 249 at MM 26
From now through July 2020, The roadway will be reduced to one lane, controlled by a temporary signal, for full depth deck repairs.

DAVIDSON COUNTY, Interstate 440 Reconstruction
Nightly, 9PM-5AM, There will be intermittent ramp closures at Nolensville Pike, Murphy Road, West End Avenue, Hillsboro Pike, and I-65 for phase 2 ramp construction. Detours will be in place.

Nightly, 9PM-5AM, There will be a right lane closure on Murphy Rd from WB I-440 ramp to Park Circle, West End Ave from Mid-Block to I-440 Ramp, and Nolensville Pike from I-440 ramp to Melrose Ave for boring operation. At least one lane will remain open in both directions. There will be a right shoulder closure on EB I-440 from Nolensville Pike to I-24, I-24 On and Off Ramps, and I-40 On and Off Ramps for roadway lighting. There will also be rolling roadblocks as needed for sign installation.

From now through August 2020, I-440 will be restricted to two travel lanes in each direction from 5AM- 9PM and one travel lane in each direction from 9PM-5AM.

Look Ahead – Friday, March 20 at 9 p.m. through Monday, Monday, March 23 at 5 a.m., the I-440 interchange at I-65 will be closed. Traffic going toward the interchange will be reduced to one lane and detoured away from the construction area.
o Eastbound traffic on I-440 will be detoured to I-65 southbound.
o Westbound traffic on I-440 will be detoured to I-65 northbound.
o Northbound traffic on I-65 will be detoured to I-440 eastbound.
o Southbound traffic on I-65 will be detoured to I-440 westbound.
o Franklin Road will be closed from Berry Road to Woodmont Boulevard.
o Map with detour information is available here.

In the event of inclement weather, the alternate date for the I-440/I-65 interchange closure will be the weekend of March 27.

DAVIDSON COUNTY, I-24 Interchange Improvements at Hickory Hollow
Daily, 9AM-3PM, There will be rolling roadblocks for blasting at the Hickory Hollow interchange on I-24.

Nightly, 8PM-5AM, There will be a lane closure at MM 60 for pouring concrete.
Wednesday, March 18, 8PM-5AM, There will be lane closures for construction.

DAVIDSON COUNTY, Construction of Pedestrian Facilities on U.S. 70S (SR 1) from SR 251 (Old Hickory Boulevard) (LM 7.85) to Erin Lane (LM 8.30)
Daily, 9AM-3PM, There will be a lane closure for construction work.

DAVIDSON COUNTY, Widening SR 112 (Clarksville Highway) from SR 155 to SR 12
Daily, 9AM-3PM, There will be lane closures for clearing/grubbing and construction activities.

DAVIDSON AND RUTHERFORD COUNTY, I-24 SMART Corridor
Nightly, 8PM-5AM, There will be intermittent lane closures between MM 55-80 for barrier rail relocation.

MAURY COUNTY, Widening of Duplex Road from US 31 to Secluded Lane
Daily, 9AM-3:30PM, There will be temporary lane closures on SR 247 for road widening.
SMITH COUNTY, Bridge Repair on SR 53 over Mulherrin Creek (LM 7.18)

From now through April 2020, SR 53 will be reduced to one 9' lane at the bridge over Mulherrin Creek for bridge work. Traffic will be controlled by temporary signals.

SUMNER COUNTY, Albert Gallatin Ave./Hatten Track Road Extension
Weekdays 9AM-3PM and Weekends 6AM-6PM, There will be intermittent temporary lane closures on SR 109 between the intersections of SR 25 (River Road) and Old State Hwy 109 in both directions for bridge concrete pours. One lane will remain open in each direction at all times.

WILLIAMSON COUNTY, Widening Franklin Rd (SR 6) from Moores Lane to Concord Rd
Nightly, 6PM-6AM There will be lane closures for gas line installation.

WILLIAMSON COUNTY, Construction of Mack Hatcher NW Quadrant
Daily, 9AM-3PM, There will be a lane closure on SR 96 between Front Street and Boyd Mill Ave for road widening activities.

WILSON COUNTY, Bridge Repair on SR 26 over Sinking Creek
Through May 2020, SR 26 will be down to one 10' lane in each direction on the bridge over Sinking Creek.

One lane will be open in each direction.

WILSON COUNTY, The repair of the bridges on US 231 (SR 10) over Town Creek (LM 13.56) in Lebanon
From now through May 2020, US 231 (SR 10) will be down to one 11' lane in each direction for bridge work.

WILSON COUNTY, The repair of the bridges on U.S. 231 (S.R. 10) over Spring Creek (L.M. 19.48).
From now through November 2020, US 231 (SR 10) will be down to one 11' lane in each direction for bridge work.

Friday, March 13, 8:30AM-3PM, There will be intermittent closures to set beams. In case of weather, work will be done Saturday or Sunday.

MAINTENANCE & UTILITIES
DAVIDSON COUNTY
Thursday, March 5, 9PM-5AM, There will be a lane closure on Hillsboro Road between Abbot Martin and Glen Echo for the construction of a bus lane.

Friday, March 6, 9AM-3PM, There will be a lane closure in both directions of SR 6 for Mansker Creek bridge

HUMPHREYS COUNTY
Tuesday, March 17, 9AM-3PM, There will be lane closures on I-40 between MM 142-144 for pothole patching.

RUTHERFORD COUNTY
Thursday and Friday, 8PM-5AM, There will be a lane closure on I-840 at MM 55 for clean up.

SMITH AND WILSON COUNTY
Daily, 7AM-7PM, There will be lane closures and rolling roadblocks on I-40 between MM 239-263 as needed for emergency clean up.

ROBERTSON COUNTY
Nightly, 8PM-5AM, There will be lane closures on I-65 in various locations for milling.

WILSON COUNTY
Friday, March 13, 9AM and 12PM, There will be rolling roadblocks at MM 229 for TVA emergency repairs.

Each roadblock will last approximately 30 minutes.

Saturday, March 14, 8AM-2PM, I-40 will be CLOSED between MM 226-235 for TVA emergency repairs. TVA crews anticipate completing the work on Saturday, but a closure on Sunday (8AM-2PM) may be required due to weather or other further repair needs. Please check Smartway.TN.gov for the latest closure information. Detour information is as follows.
o Eastbound drivers will be directed off the interstate at exit 226 (SR 171 – Mt. Juliet Rd) and take 171
southbound, SR 265 (Central Pike) eastbound, and I-840 eastbound.
o Westbound drivers will be directed off the interstate at exit 235 (I-840) and take I-840 westbound, SR

265 (Central Pike) westbound, and SR 171 (Mt. Juliet Road) northbound.
o Westbound tractor trailer drivers will need to take I-840 westbound to I-24 westbound.
o A detour map is available here: https://www.tn.gov/content/dam/tn/tdot/region-3-
documents/TVA%20Emergency%20Repairs.pdf

Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity. Information in this report is provided to the Department of Transportation by the contractors.

Most work is weather dependent and subject to change due to inclement weather.
From your desktop or mobile device, get the latest construction activity and live streaming SmartWay traffic
cameras at www.TNSmartWay.com/Traffic. Travelers can also dial 511 from any land-line or cellular phone for travel
information, or follow us on Twitter at www.twitter.com/TN511 for statewide travel.
As always, drivers are reminded to use all motorist information tools wisely and Know Before You Go! by checking travel conditions before leaving for your destination.  Drivers should never tweet, text or talk on a cell phone while behind the wheel.