TDOT Construction Updates for July 27 – August 2, 2017

DAVIDSON COUNTY AND WILLIAMSON COUNTY, Resurfacing on I-65 from the Williamson County Line to South of Armory Drive

  • Nightly, 8PM through 5AM, There will be alternating lane closures on I-65 in both directions (including exit and entrance ramps) from the Williamson County line (M.M. 74) to South of Harding Place (M.M. 79) for milling and paving operations. At least one lane will remain open in each direction. The exit and entrance ramps will be temporarily closed for approximately 2 hours at a time on the Harding Place ramps and Old Hickory Boulevard ramps. Signage will be in place.

MAURY COUNTY, On-Call Concrete Pavement Repair on SR 396

  • Daily, 4AM through 8PM, There will be traffic shifts on the ramps at SR 396 (Saturn Parkway) and Kedron Road to saw and replace concrete. Traffic lanes will not be affected.

WILLIAMSON COUNTY

Tuesday, August 1 and Wednesday, August 2, 9AM through 3PM, There will be a lane closure on SR 252 (Wilson Pike) in both directions between Clovercroft Road and McEwen Drive for milling and paving work. At least one lane will remain open at all times.

Daily, 9AM through 3PM, There will be various lane closures on SR 96 in both directions for slope mowing along the shoulder. One lane will remain open at all times.

Get the latest traffic updates right here!