1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 |
2. I-65 over Railroad Tracks by mile marker 72
Status: Not Deficient
*Sufficiency Rating: 83.1 which is 3.30 lower than the average sufficiency rating for a bridge.
Year Built: 1956 (reconstructed in 1993)
Daily traffic: 135,840 vehicles a day with projected 216,688 per day by 2032.
*The Sufficiency Rating determines if a bridge should remain in service or if the bridge is unfit for continued use. A score of 100 represents a fully functioning and sufficient bridge. A score of 0 represents a defective and insufficient bridge.